Enerbrain

Michelin
Italy

Total monitoring and 40% efficiency on HVAC.

Features

Country: Italy
Sqm: 500.000
HVAC consumption: 600.000€
HVAC system: all air heating and cooling plant
Number of produced pieces: 1.000.000/year

The Client

Founded in 1889, Michelin Italia has an international presence with over 70 production plants on 5 continents. Michelin Alessandria is a production plant consisting of various buildings that extend over a total covered area of 500,000 square metres. The plant is active in three shifts, 7 days a week, and produces more than 1,000,000 tyres every year.

Results

CO₂ not emitted in one year
0 t
Time in comfort
0 %
Energy efficiency
0 %

Project

Enerbrain worked at the project with two main goals:

  • Provide the detailed knowledge of the energy flows of the production site through a real time monitoring dashboard
  • Reduce energy consumption and workers’ complaints about ventilation, heating and air conditioning in the most energy-intensive buildings without stopping production and without modifying the HVAC system.

To achieve these goals, Enerbrain divided the site into several main thermic zones, implemented a monitoring system and an implementation system that would allow automatic control of ventilation and heating.

  • Control over 150 energy flows.
  • 40% decrease in HVAC consumption on controlled buildings.
  • Decrease of 10% in total consumption during production stops.

Monthly HVAC-related electricity use before (“Baseline”) and after installing Enerbrain (“Enerbrain ON”).

Graphic reference year: 2019-2020

Enerbrain and Michelin for the production plant in Alessandria.

Michelin Italia

Discover more case studies

Offices, Industries, Shopping centres, are just some of Enerbrain’s sustainable development partners.
Scroll to Top